What Happens After You Choose a Builder, Before Work Starts on Site?
Choosing a builder is a major milestone, but it is not usually the day construction starts. Between appointment and site work there is a practical pre-construction phase. The job is to turn the chosen design and scope into a documented, consent-ready, buildable plan with clear responsibilities. The exact order depends on the project.
Confirm what has actually been chosen
Before the project moves forward, make sure there is a shared understanding of the scope. That includes the drawings and specification being priced, what is included and excluded, current allowances, known site constraints, responsibilities for consultants and consents, and how changes will be handled. A quote may support the decision to appoint a builder, but it does not normally contain every term needed to run the project.
For residential building work costing $30,000 or more including GST, a written contract is required. Building Performance also encourages written contracts for smaller work because they record the agreed terms and help resolve questions later. [1]
Review the contract and required builder information
For work at or above the statutory threshold, the contractor must provide a disclosure statement and the standard checklist before the contract is signed. The disclosure statement includes information about the business, key contact people, relevant qualifications and experience, insurance, and any guarantees or warranties offered. [1]
| Confirm before signing | Why it matters |
|---|---|
| Scope and specification | Sets the work, materials and finish level that the contract price is based on. |
| Price and payment process | Clarifies the contract price or calculation method, progress claims and receipts. |
| Start and completion expectations | Explains programme assumptions, dependencies and how delays are dealt with. |
| Consents and approvals | States who is responsible for obtaining them and what information is required. |
| Variations and defects | Sets the process for agreeing changes and addressing issues that arise. |
| Dispute process | Provides a known route if the parties do not agree. |
Get the approvals path clear
Many projects need a building consent, and some may also need resource consent or other approvals. The proposed work must be checked against the applicable rules, and the party responsible for the application should be clear in the contract. Building Performance says all building work must comply with the Building Code, whether or not it needs a building consent. [2]
Do not treat a general online checklist as confirmation for a specific site. Councils can identify planning or district-plan requirements that sit alongside the building process. Where the work is structural, involves weathertightness or otherwise includes Restricted Building Work, use appropriately licensed people and retain the resulting records.
Make the project buildable on paper
Before a start date can be meaningful, the team normally needs enough information to coordinate the work. That can include final selections, engineering or consultant information, consented drawings, supplier lead times, site access, temporary services, demolition or protection requirements, and an agreed approach to existing conditions.
Some choices take longer than expected because they depend on samples, supplier information, owner decisions or consent approval. A builder can help sequence these decisions, but homeowners should expect to make timely decisions where the programme depends on them.
Set up insurance, access and site rules
Talk with your insurer before major renovation or construction begins. Do not assume the builder's insurance automatically covers the existing house, contents or every project risk. Check the relevant policy, exclusions and who needs to arrange any contract-works cover.
Agree access, site boundaries, parking, material delivery areas, neighbours, working hours, communication preferences, protection of retained areas and what happens if the property remains occupied. These arrangements are not minor details. They can determine whether the site is safe and workable from day one.
Hold a useful pre-start meeting
Building Performance sources
Before Work Starts on Site
Need a Clearer View of Your Project?
Henare Construction can help Northland homeowners clarify scope, timing and the information needed for a well-planned build or renovation.
Talk to Our Team